Location

Windsor, Canada

Event Website

http://ttc22.ca

Start Date

2022 12:00 AM

End Date

2022 12:00 AM

Description

Distributed energy resources have grown significantly in Canada and the world over the past decade, particularly in the agricultural sector. As P2P (peer-to-peer) energy trading plays a fundamental role in renewable energy uptake and system flexibility for the low-carbon energy transition, this paper provides an overview of this approach from a techno-economic standpoint for two greenhouses located in Leamington, Ontario. The real-time site solar irradiation, ambient temperature, and load demand over 8760 h have been utilized to drive the designs. In this investigation, two cases are assessed for pepper greenhouse: Case I: energy purchase from the grid and Case II: energy purchase from excess energy of neighbor which is cucumber-tomato greenhouse. The integration of 50 kW PV/1 kWh battery/35 kW converter achieves the feasibility criteria by recording net present cost (NPC) and cost of energy (COE), which are $29.6k and $0.044/kWh, respectively.

Included in

Engineering Commons

COinS
 
Jan 1st, 12:00 AM Jan 1st, 12:00 AM

Greenhouse electrification via transactive energy management strategy

Windsor, Canada

Distributed energy resources have grown significantly in Canada and the world over the past decade, particularly in the agricultural sector. As P2P (peer-to-peer) energy trading plays a fundamental role in renewable energy uptake and system flexibility for the low-carbon energy transition, this paper provides an overview of this approach from a techno-economic standpoint for two greenhouses located in Leamington, Ontario. The real-time site solar irradiation, ambient temperature, and load demand over 8760 h have been utilized to drive the designs. In this investigation, two cases are assessed for pepper greenhouse: Case I: energy purchase from the grid and Case II: energy purchase from excess energy of neighbor which is cucumber-tomato greenhouse. The integration of 50 kW PV/1 kWh battery/35 kW converter achieves the feasibility criteria by recording net present cost (NPC) and cost of energy (COE), which are $29.6k and $0.044/kWh, respectively.

https://scholar.uwindsor.ca/wtel/2022/papers/7